Sea front terraces with impertek supports

23,000 Jack supports at Jesolo Lido Design District

The construction of Jesolo Lido Design District began in the early 2000s thanks to the collaboration between the prestigious New York architecture firm Meier Partners and the real estate companies RIV Group and Stelladelmar Real Estate SRL.

The project involved the creation of a quarter dedicated to design, luxury and the search for an unforgettable experience: all harmonized by a common design philosophy and aesthetics that have always distinguished every project by Archistar Richard Meier.

The radical change of the skyline of the Venetian coast through the Jesolo Lido Design District project has had several stages of implementation: the first, completed in 2007, ended with the construction of The Pool Houses village; the second, The Beach Houses, was completed with the construction of 74 sea view apartments in 2012. The most recent phase, The Summer Houses, was completed in 2021 with the inauguration of two condominiums, one of seven and one of ten floors. In the future, it is planned the construction of three other residential complexes: The Beach Residences, The Tower and The Park Villas with the same architectural features, transparencies and large volumes, which, like the previous buildings, will represent the maximum expression of luxury.

The Summer Houses has two buildings, The Tower and The Gallery, which constitute the main and avant-garde elements of the entire project. The buildings cover an area of ​​11,500 square meters, of which 3000 are dedicated to a relax area equipped with every comfort dedicated to well-being: SPA, five swimming pools, sauna, steam bath, green areas and solarium. We find the architectural elements that characterize the whole quarter: bright windows and large terraces allow you to admire the panoramic view of the beach of the Adriatic Sea every day.

The raised floors of the outdoor areas and of the numerous terraces of The Summer Houses were made of decking laid on 40x20 mm joists and 23,000 Jack Supports from the PEDESTAL line by Impertek.

Thanks to the many combinations of components, Jack supports, that belongs to the Pedestal Line range, allows you to realize any flooring with heights from 35 to 380 mm quickly and easily, enjoying great appreciation by the installers.

The Jack Supports are composed of bodies available in various heights and eight different types of heads that allow you to lay floors both with tile finishes (thanks to the heads with 18 mm high and from 2 to 10 mm thick tabs) and wood/decking finishes (with flat, rectangular, square or circular heads for 40- or 60-mm joists).

The Jack Supports have a load capacity up to 400 kg per unit: which correspond to 1,600 kg/sqm if distributed on 50x50 cm tiles and increase up to 2,500 kg /sqm with 40x40 cm tiles.

All Impertek supports have been designed for the installation of any type of flooring in ceramic, stone and decking, they are designed to adapt to all the installation needs that may arise on the construction sites and are produced with controlled plastic material, recycled and recyclable again.